welcome,guest
TitleProduct

triac dimmable cob led bulb 15w,99lm/w

  • Price:

    Negotiable

  • minimum:

  • Total supply:

  • Delivery term:

    The date of payment from buyers deliver within days

  • seat:

    Beijing

  • Validity to:

    Long-term effective

  • Last update:

    2017-12-22 21:51

  • Browse the number:

    152

Send an inquiries

Company Profile

Signcomplex Limited

By certification [File Integrity]

Contact: signcomplex(Ms.)  

Telephone: (86 755) 28093844 Ext:8034 (86 755) 15814413567

Area: Beijing

Address: Beijing

Website: http://signcomplex.chinasatcomgm.com/

Product details
Model Number: DLD05-015-AW-NW-01 Brand Name: Signcomplex Key Specifications/Special Features: triac dimmable cob led bulb 15w,99lm/wIVAR COB DOWNLIGHTTDLD05-0159w 15w 20w 25w 35w is availableFeatures of the cob led bulb 15w:
*TRIAC dimmable, fluent, no strobe.
*Dimmable range 1%~100%;compatible with most of trailing
and leading edge dimmers.
*Adopt die-casting aluminum alloy to make the main body.
*Use PMMA of high transmittance as the material of panel.
*Unique and delicate looking design.
*Excellent heat dissipation performance to ensure the long
lifetime of LED
*The driver and main body use separation design which
ensure the long lifetime of both parts.
*High-efficient and energy -saving LED driver.
*Can replace traditional downlight.


Package Information of the cob led bulb 15w:
Inner box dimension: 180*170*103MM
Net weight: 0.37KG
Gross weight: 0.47KG
Carton box dimension (24PCS inside) : 530*375*430MM


Other cautions
1.Power must be cut off before installation, fix it on the position of installation holes, connection of the
power supply must be sealed.
2.Please read the specification first, to make sure the service environment matches the condition in the
specification before using.
3.Please confirm the applicable power supply before using.
4.Make sure the switch of product is off before connect to the power supply to prevent electric shock.
5.Operation against rules may damage your property even harm to your personal safety.
6.Preliminarily estimate required quantity of LED lights, then according to the power rating of single flood
light to figure out the total power and design power supply plan.
7.The light can't be installed on the tubes and pipes.
8.If the exterior flexible cable or wire is damaged, it must exchange by the supplier, its agent or other similar
qualified personnel to avoid dangers.
Shipping Information:
  • FOB Port: Shenzhen and Hongkong
  • Lead Time: 5 - 12 days
Main Export Markets:
  • Asia
  • Central/South America
  • Eastern Europe
  • Mid East/Africa
  • North America
  • Western Europe

Download more information about this product